WM-E1S Modem for Honeywell, Elster Meters

Cellular modem for Honeywell / Elster meters and Itron, Landis+Gyr electricity meters

Electricity meter
Smart Metering
Wireless access
RS232 / RS485
FW Updates
Remote Access

 

Last Updated on 2026-05-12

UPGRADE THE MODEMS NOT THE SMART METERS!

All around the world mobile operators are shutting down 2G/3G networks in order to give way to 5G. Companies that operate smart meters with 2G/3G connectivity must plan the migration to the latest 4G LTE network which is well-positioned to dominate smart metering communication technologies in the upcoming years. The migration to LTE has many advantages, for example, a shorter readout time due to the high-speed network with low latency.

Utilities have two options for migration: replace the meters or upgrade the modems! The 1st option comes with a high CAPEX, while the 2nd option is a future-proof solution that reduces TCO.  

Our company develops cellular modems that work smoothly and are fully compatible with the different models of electricity meters.

These devices were designed to fit under the terminal cover of the meter and are compliant with all Honeywell / Elster meter standards – optionally with Itron, Landis+Gyr standards

Our cellular modems represent a future-proof migration solution to the LTE network with the same functionality, on higher data speed. Configuration and firmware updates can be done remotely, minimizing the need for costly site visits.

Quick Specifications — WM-E1S HONEYWELL / ELSTER
Device type Smart electricity metering cellular modem
Primary use case Smart metering (AMI/AMR), Smart Grid, LTE and Cat.M upgrade of legacy meters
Cellular & RF Access Technology LTE Cat.1/2G, CSD; LTE Cat.M/NB with 450 MHz and 2G support
Protocols IEC Transparent, TCP
Interfaces, Physical Connectors RS232 (D-SUB9 or D-SUB25 or RJ12), RS485 (2-wire or 4-wire), 2 Digital Inputs (DI) optional
Meter compatibility – Honeywell / Elster Alpha 1500, 1700, 1800, 1140, 1160 type electricity meters
– Honeywell / Elster AS1253 type electricity meters
Power & Environment AC power from the meter  between -40 Celsius and +70 Celsius degree, IP51 protection
Approvals & Certifications CE, RoHS, ReD DA
Firmware Customized Free RToS (embedded system)
Installation Fit under the terminal cover of the meter
Configuration WM-E Term configuration software (downloadable) via local or TCP
Device Management Device Manager software (Remote provisioning, firmware update, bulk config)
Security TLS, Super capacitor (LastGASP notification) option, Surge protection

 

Cellular communication modem that has been designed specifically for the automatized remote readout of electricity meters. The device can be ordered with various cellular module types.
You can save money by using our modem because furthermore there is no need for manual readout of the meter systems.

The modem is connectable through its RS232 and RS485 connection, it provides transparent data link to the HES, through the LTE cellular network.

By option, the 2 digital input feature is also available, which can be used for input status monitoring and sabotage detection.

Our modem forms part of the AMI (Advanced Metering Infrastructure) of the utility company.

The device can be used to remotely read the meter’s registers, consumption data of the electricity meters and modify modem parameters. The readout takes place in „PULL” mode, the modem provides transparent communication between the meter and the electricity provider’s HES center.

The modem can be installed under the terminal cover of the meter sealed by the service provider.

The device is configurable with the WM-E Term®  software and remotely manageable with Device Manager® software (order option).

 

Main features

  • Cellular module order options:
    • LTE Cat.1 / 2G, CSD
    • LTE Cat.M / Cat.NB with optional 2G and 450MHz support
  • It can be assembled into the meter’s enclosure and fastened
  • Power supply (AC) from metrology (optional DC)
  • Inputs (order options) – two at the same time:
    • RS232 connector (D-SUB9 / D-SUB25 / RJ12 / RJ45)
    • RS485 connector (2 or 4-wire/ RJ12 / RJ45)
    • 2 digital inputs (monitoring / sabotage detection)
  • Compatibility:
    • Honeywell® Alpha A1500, A1700, A1800, A1140, A1160 meters
    • Elster® AS1253 meter
    • Itron® SL7000, EM600 (E620), ACE6000, ACE8000 meters
    • Landis+Gyr® ZMG type electricity meters
  • Surge protection option (from 4kV up to 12kV)
  • Supercapacitor option (SMS notification of power outage)
  • „Pull” mode
  • IEC 62056-21 protocol, transparent data transmission, TLS option
  • WM-E Term® application (mass configuration, FW refresh)
  • Device Manager® software (order options)

 

Application & Use Cases

 

Industries

 

Solution

Design and outfit

  • The modem is installable inside the meter enclosure
  • RS232 connector options (D-SUB9 / D-SUB25 / RJ12 / RJ45)
  • RS485 connector options (2- or 4 wire / RJ12 / RJ45)
  • 2 digital input option (input status / sabotage detection)
  • AC power from the meter (optional DC power)

 

Compatibility

  • Honeywell® / Elster®  Alpha A1500, A1700, A1800 and A1140, A1160 electricity meters
  • Elster® AS1253 meter
  • Itron® SL7000, EM600 (E620), ACE6000, ACE8000 meters
  • Landis+Gyr® ZMG electricity meters

 

Operation

  • „Pull” mode
  • IEC 62056-21 protocol, transparent data transmission
  • CSData call (2G)
  • Immediate SMS alarm notification (from power outage, input status changes)

 

Accessories (order option)

  • RJ45 cable, converter (for meter connection)
  • External LTE antenna (SMA, 50 Ohm)
  • TLS encryption
  • WM-E Term® software (mass fw updates, configuration)
  • You can manage the device by Device Manager® software

 

Technical data

WM-E1S

Product Datasheet

Updated: 2026-03-27


Quick Reference Guide

Updated: 2025-12-03

Installation Manual

Updated: 2026-03-12

WM-E Term User Manual

Updated: 2026-01-19

WM-E1S Parameter Description

Updated: 2025-09-30

WM-E Term Appendix

Updated: 2025-01-22


WM-E Term configuration tool

Updated: 2026-01-19

WM-E1S sample configuration file for WM-E Term (compressed ZIP file, extract the CFG file)

Updated: 2023-11-27

Video tutorial – Chapter 1. WM-E Term: Introduction

Video tutorial – Chapter 2. WM-E Term: How to Create a log file from the connected modem?

Video tutorial – Chapter 3. WM-E Term: Serial port connection settings

Video tutorial – Chapter 4. WM-E Term: Debug redirection

Video tutorial – Chapter 5. WM-E Term: How to change the Display Language?

Video tutorial – Chapter 6. WM-E Term: Use Log Files in WM-E Term (Tutorial video)

GET QUOTE   Click this button to request a quote for this Product!

Relevant products

...
4G LTE ANTENNA WITH MAGNETIC MOUNT (6dBi, SMA)

4G LTE antenna with magnetic mount, SMA connection, 2.5m long RG174 cable, 6dBi max. gain

...
WM-E3S Modem for Elster AS smart meter family

Cellular modem specifically designed for Honeywell AS220/AS230/AS300, AS1440 and AS3000/AS3500 electricity meters

...
IoT DEVICE MANAGER

The remote management and maintenance of an IIoT solution can be a real challenge. Improve the network availability and operational efficiency of your fleet!

We are using Google Analytics

Please note that we use Google Analytics monitoring to analyze traffic and interests on our website, in order to provide an anonymous view of the distribution of visits.
uses personal information - to make internal, marketing decisions (promotions, trends, visits to visiting companies). We don't send these data to third parties.
Learn more about Google's privacy policy: www.google.com/analytics

Please use the buttons below to enable if you accept use Google Analytics, or indicate if you do not enable it.